Built in 1911 to mark the coronation of King George V, the Bexhill Colonnade is a prominent Edwardian seafront structure designed to provide sheltered seating, tearooms, and performance space. Overlooking the English Channel, it occupies a highly visible and architecturally sensitive location close to Bexhill town centre and the Grade I listed De La Warr Pavilion.
Significant water ingress had caused deterioration to external and internal elements, including structural components, commercial units, and the unusable Coastal Office. DBR Southern was appointed to repair the failed stucco balustrade, cornice, and façade, replace the asphalt terrace, and install new channel drainage to direct water away from structural elements and internal spaces. To allow trapped moisture to escape while protecting the building from the harsh marine environment, ‘Roman’ cement was used for render repairs and KEIM mineral paint for the external finishes. Following completion, the entire façade, balustrade, and cupolas were redecorated to match the original paint schemes.
Due to the Colonnade’s proximity to the sea, the curved timber windows of the cupolas required extensive repair. The joinery was expertly restored using profiles matching the existing fabric, all glazing was replaced, and the frames were redecorated in the Colonnade’s colour scheme. The external lighting was also upgraded by rewiring the historic cast-iron lanterns, fitting new LED globe heads, and installing new ground-level uplights.
To enable complete waterproofing of the terraces, the lower-level quarry tiles were carefully removed and a liquid waterproofing system installed before the tiles were relaid in their exact original positions. Where existing tiles were inevitably lost, like-for-like replacements were sourced from local reclamation yards, with a large proportion recovered from a church reordering project in a nearby village. This careful selection of reclaimed materials achieved a sympathetic match while supporting the reuse and recycling of historic materials.
Working throughout the winter off-season presented significant challenges, as the works were highly weather-dependent. Through careful sequencing and flexibility within the supply chain, DBR Southern completed the project on time before Easter, enabling Rother District Council to simultaneously undertake internal decoration and fit-out works ahead of the reopening of community spaces, including shops, cafés, and offices. This much-loved Ionic structure has received the careful attention required to restore it to its former glory while protecting its historic fabric and future use for many years to come.