Victoria Tower

Survey

1 / 2

Rising above the Palace of Westminster, Victoria Tower is one of the most recognisable features of the Parliamentary Estate. Constructed in Anston Magnesian Limestone and Clipsham Oolitic Limestone, its intricate masonry and soaring height require regular specialist inspection to ensure the continued safety and preservation of the historic fabric.

Client
Palace of Westminster Parliamentary Estates Directorate
Dates
January 2022
Location
Westminster
Grade listing
Grade II
Fabric
Stone

Reaching new heights

DBR was appointed to carry out a detailed inspection of the tower's masonry using a 103-metre cherry picker, allowing conservation specialists to safely access areas that would otherwise be difficult to reach. The high-level survey enabled the team to closely examine the condition of the stonework and identify areas requiring immediate attention.

Chat GPT Image Jul 16 2026 11 07 51 AM

Making the structure safe

During the inspection, loose masonry posing a potential risk was carefully removed to safeguard both the building and those below. Localised netting was also installed around fractured pinnacles to provide temporary protection while preserving the historic stonework.

Chat GPT Image Jul 16 2026 11 10 02 AM

Informing future conservation

By combining specialist access techniques with conservation expertise, DBR provided a thorough assessment of the tower's masonry condition while undertaking essential safety measures. The project formed an important step in protecting one of the United Kingdom's most significant historic landmarks and supporting its ongoing conservation.

Chat GPT Image Jul 16 2026 11 08 52 AM